Sign in
Supplier
This supplier has been verified onsite by world-leading inspection company,
TüVRheinland

by {0}
1999-08
2003-05
2007-09
2013-12
2019-09
1999-08
In August 1999, the domestication no.2 continuous casting machine was successfully tested
In August 1999, the domestication no.2 continuous casting machine was successfully tested
2003-05
Enter the new century
Enter the new century, adopt the most advanced metallurgical technology and control technology, the high starting point of the new 150 tons of stainless steel project, to create a core competitiveness of modern TIsco.
On March 30, 2005, the foundation stone of the 150-ton stainless steel steelmaking project was laid.
In August 2006, after arduous struggle, the carbon steel system of north District steelmaking project was put into operation.
In September 2006, the first stainless steel heat test in north district was successful.
Since then, Tisco has a production capacity of 3 million tons of stainless steel, making it the world's largest stainless steel producer.
This is another important milestone in the history of the second steelmaking plant.
After the completion of the new steelmaking project, the production area of the second steelmaking plant is divided into the north and south areas, of which the north area is the new steelmaking area.
2007-09
In September 2007, no. 3 Shuangliu continuous casting machine in the North district was successfully tested
In September 2007, no. 3 Shuangliu continuous casting machine in the North district was successfully tested
2013-12
In December 2013, 180 tons of AOD furnace no. 0 of the Stainless steel transformation project in the North district was completed and put into operation
In December 2013, 180 tons of AOD furnace no. 0 of the Stainless steel transformation project in the North district was completed and put into operation
2019-09
Set production processing, sold all over the world
Set production processing, sold all over the world